spncryn/log

Menu

06012021

Didn’t get as much done today, unusually tired for some reason tonight. However, the area around the observatory’s road is functionally complete now, including sound masking (along with new audio for footsteps on hard surfaces, although they still need a lot of work I think). The Capitol Building was temporarily stormed today, which is probably why I had such difficulty concentrating. Hopefully tomorrow I’ll be able to get back on track.