21122021
Continued organising things, packing things up, etc. I hope to be finished by tomorrow, so that I can start vacuuming the day after. Ordered some new fast-mount clips for the mic rig today which should really help with deployment times.
I went out this morning before (and then after) session to test it out and it sounds great, and records very cleanly. Some future upgrades I’m looking at are investing in proper wind protection (probably a full zeppelin, although that might require me to switch out the base entirely), and some foam baffles to mount as inserts between the mics, which I think might be able to be arranged in such a way to create a pseudo-binaural effect. The latter is by far the cheaper and more immediately accessible option, although I’ll have to find somewhere that can cut foam to length.
Alternately, instead of a full zeppelin, I might be able to get away with purchasing endcaps and mounting them directly to the foam panels. That might actually be the ideal solution both price-wise and in terms of flexibility.