spncryn/log

Menu

22092020

Yet another day of work on the observatory. Rearranged the exterior a bit to accommodate some adjustments in the interior layout. The dome is easily the most painful part of the process and for a good few hours today I genuinely considered just rebuilding this entire section in a top-down perspective because I was struggling so greatly not only to build but even just visualise how all the walls fit together. I ended up disabling the FoV system in the observatory because it was getting too difficult to work with; I might still end up re-enabling it later on as the casters are still present, meaning the advanced lighting system will work by default with it which is basically the same kind of effect. 

Work’s been real slow lately as a direct result of my utter ineptitude at visualising 3D space, and it’s been quite testing on my patience, to put it gently. If I can get this shit finished though by the end of the week the actual furniture should be smooth sailing. Fingers crossed.

Leave a Reply

Your email address will not be published. Required fields are marked *