spncryn/log

Menu

08122019

Started working today on some cinematics for the trailer. I spent the entire first half of the day trying to figure out how exactly they’d look, which is almost always the longest and most difficult part of the process: but once I got the first one sketched out everything else fell into place almost immediately afterwards. I’m gonna continue working on them for the rest of the week: hopefully I can average around two or three a day, to a total of a dozen or so. Since I’m working at a smaller resolution, hopefully it’ll be a bit easier. All the images are gonna have to be drawn and assembled at 4:3 (or 1.33:1) aspect ratio which is gonna be a little bit of an annoyance because it’s not a resolution I’m really used to working at but I reckon I’ll get used to it pretty quickly in due time. I’m looking forward to this week’s work.